Welcome to SSC Corporate Website
  | INT. Commodity Trading >> Metals >> Copper Cathodes
   
| COPPER CATHODES | Related Links

•  Origin: Russia or CIS

•  Loading Port : sellers option

•  Chemical Composition:

•  Packaging: Bundle

•  Minimum Quantity: 1000 x 12 = 12000 MTW.

•  Shipment: Twelve Shipments

•  Pricing: Click here

Delivery period: 30 to 45 Days after accepting the buyer LC by the Seller bank.

Inspection: SGS

Irrevocable , Revolving , Confirmed, LC payable at sight . Third party B/L & other documents should acceptable .

By 20 feet containers

1 – Buyer Send LOI

2 - Seller will send FCO

3 – Buyer will sign, stamp and send back the FCO & BCL.

4 – Seller send Contract draft to the buyer.

5 – When both parties do agree about everything, the Buyer and seller do sign the final Contract.

6 – The Buyer issue Non Operative LC, the Seller issue 2% PB to became operative LC

 

Urea
Cement
Sugar
Metal
>> HMS 1&2

>> Used Rails

>> Copper Cathodes
 
Pertolium

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ABOUT US | IT SOLUTIONS | COMMODITIES TRADING | CONTRACTING AND SUPPLY | CONTACT